The Alchimist Tower
Veolia | Apa Nova Bucuresti
Case Study 41 | SIMONA
Installation of a new wastewater pressure pipe in a hard-to-reach area. Thanks to the short overall length, the pipe modules were easily and safely inserted into the narrow spaces of the old sewer without disturbing traffic.
Case Study | TRACTO
Danson Park pipeline rehabilitation - to improve sewer flow and reduce the risk of blockages. Minimise disruption to park visitors and preserve the natural beauty of the park.